Skip to main content

Call For Bids

Project NameJob NumberBid DateBid Status
Phase 2: Foundation Installation (Multipurpose Laboratory Building)24600-01 8/28/2025, 11:30amBidding
Contract Documents Vol 1-3  - Phase 2 Foundation Installation (Multipurpose Lab Building) Contract Documents Vol 4 - Phase 2 Foundation Installation (Multipurpose Lab Building)Addendum 1 (8/22/2025)Pre-Bid Meeting Sign-in Sheet (8/19/2025)Planholders List (8/22/2025)
Project NameJob NumberBid DateBid Status
Marin Lagoon Pump Stations #2 to #9 Control Panel Enclosure Repairs24460-058/28/2025, 11:00am Bidding
Contract Documents - Marin Lagoon Pump Stations #2 to #9 Control Panel Enclosure RepairsPre-Bid Meeting Sign-in Sheet (8/19/2025)Planholders List (8/19/2025)
Project NameJob NumberBid DateBid Status
2025 Effluent Storage Pond Vegetation Management25580-04 8/19/2025, 11:00amClosed
Contract Documents - 2025 Effluent Storage Pond Vegetation ManagementAddendum 1 (8/18/2025)Bid Tabulation (8/19/2025)

 

 

 

 

 

 

 

 

 

Join our mailing list